SUNTORY PEPSI CAN THO SITE WAS AWARDED 200,000 CONSTRUCTION HOURS WITHOUT LOST TIME INJURY.
Suntory Pepsico decided to boost their soft drink manufacturing capacity by expanding their existing factory and chose TUAN LE as the main contractor with a construction contract value of 4 million USD.
The construction was completed in 2 phases with a total contract value of 4 million within 8 months and free of lost time injury.
- Project Name
- PEPSI CAN THO PLANT EXTENSION
- Location
- TRA NOC II IP, CAN THO CITY, VIETNAM
- Client
- SUNTORY PEPSI
- Value
- USD 4 M
- Contract Duration
- 8 MONTHS
- Consultant(s)
- CHAN PHUONG ENGINEERING, TOYO VIETNAM
- Scope of works
- MAIN CONTRACTOR